Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453
You are accessing a document from the Department of Energy's (DOE) OSTI.GOV.
This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service.
Visit OSTI to utilize additional information resources in energy science and technology.
Abstract
This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.
- Authors:
- Publication Date:
- Research Org.:
- BWHC (US)
- Sponsoring Org.:
- USDOE Office of Environmental Management (EM) (US)
- OSTI Identifier:
- 798036
- Report Number(s):
- HNF-4681, Rev.0
TRN: US0206005
- DOE Contract Number:
- AC06-96RL13200
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 1 Aug 1999
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; CONTAINERS; PROGRAM MANAGEMENT; PACKAGING; PLUTONIUM; STABILIZATION; STORAGE FACILITIES; MODIFICATIONS; MATERIALS HANDLING EQUIPMENT
Citation Formats
HOLSTEIN, W A. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453. United States: N. p., 1999.
Web. doi:10.2172/798036.
HOLSTEIN, W A. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453. United States. doi:10.2172/798036.
HOLSTEIN, W A. Sun .
"Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453". United States. doi:10.2172/798036. https://www.osti.gov/servlets/purl/798036.
@article{osti_798036,
title = {Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453},
author = {HOLSTEIN, W A},
abstractNote = {This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.},
doi = {10.2172/798036},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {8}
}